I CAN'T STRESS THIS ENOUGH!!!! DO NOT USE THEM. CURRENTLY IN THE MIDST OF A SHITSTORM.
UPDATE 28/01/2022: JESUS CHRIST!!!! went past the house on Tuesday night. First thing we noticed they RENDERED the whole front of the house. When it's stating in the contract that there will be brickwork on one side, it's interesting because our neighbour said he requested that but was denied by the developers. Today they told us it was "approved" by the developers, not sure how true that actually is? I haven't seen anything in writing and to put it simply I don't trust their word. Meeting with them today was pointless as selling ice to a Eskimo. They tell us it nothing can be done. My thought is how can you let it be done in the first place. Clearly reading and listening is not a essential skill of being a builder.
The last time we met with the MD and site supervisor (if you can call him that), this so called supervisor advised us he would like to be there to oversee any work done as quality control. GOOD JOB on the quality control mate.
Today the MD didn't bother turning up, must be attending to other shitshows. So we get the construction manager who says he needs to see what kind of compensation they can offer but suggested maybe a black garage door....mate I can paint a door black, I don't need your builders painting it something they think is black.
So the construction manager says he'll go back to the office and see what they can offer. Mate I just want you to fix your stuff ups. Simple!!!
UPDATE 9/11 - It took them almost two months to tell me the correct windows are 3 weeks away. Not sure why they couldn't tell us this every other time we asked.
All we've got is delays after delays. Every stage there are defects that need to be rectified. Our latest inspection returned a 70 page report, long list of defects in the brickwork and framing, as well as outstanding defects yet to be rectified. We had a re-inspection done when the plumbing and wiring was done, ONLY FOR THE PERSON THAT WAS SUPPOSE TO FIX IT TO CALL ME AND ASK HOW IT SHOULD BE DONE!!!! MATE YOU SHOULD KNOW WHAT TO DO. After more delays and zero movement, we had to escalate the matter for a more senior person sent on site to oversee the work.
Let me tell you about the WINDOWS!!!! We signed the contract stating to have double glazed windows fitted. The windows arrived after the slab was laid and well before the frame was set to go up. So the windows sat on site for some time. After the frame went up, the windows were fitted promptly. We went on site to check the progress of the build and noticed the windows that were fitted WEREN'T DOUBLE GLAZED. We didn't mention anything for a couple days before emailing asking them they don't look like double glazed windows, which they confirmed it wasn't and said the right ones were ordered but the wrong ones were sent. SERIOUSLY?! Your building supervisor didn't bother checking them before fitting them?
The building supervisor is that incompetent that he didn't bother checking the correct windows were delivered before fitting them. Bear in mind the windows were sitting in the building site for over a week before they were fitted. ALSO, WE'RE THE ONES THAT HAD TO TELL THEM THE WRONG WINDOWS WE'RE INSTALLED. HAD WE NOT SAID ANYTHING ESCAPE HOMES WOULD'VE JUST LEFT THE WINDOWS IN THERE AND TAKEN THE MONEY AND SAID NOTHING.
This is the same building supervisor that took it upon himself to decide whether it was necessary to have termite protection on your home regardless if you paid for it or not. WHICH WE DID!!!!!!
Now that the wrong windows are fitted, they keep telling us the supplier can't give an ETA on when the right ones will be delivered. All we get is "we will let you know when we know". This was brought to their attention on the 17/9.
Anyone want a list of the poor work feel free to get in contact with me.
Approximate cost:
$523999